Every output between now and Sep 8, with who does it. Reworked 2026-08-14 — this replaces the old tracker.

Owners: Dennis · Claude (drafts, Dennis reviews) · David (promo/site push) · Block leads (Dennis/Kris/Faraz per block) · TBD = needs assignment.

Anchor dates: Aug 15 site re-push (David/Codrops) · Aug 25–Sep 1 dry-runs · ~Sep 1 the one prep email (gated on deps lock; poll goes earlier) · Sep 7 slides locked/travel · Sep 8–9 workshop · Sep 11 talk.

Deliverables at a glance

Attendees receive: the React-skill poll (early) · the one prep email (~Sep 1: repo clone/verify, tooling, WebGPU check, React pre-work, site link, logistics) · the Vite workshop repo (hero + 4 concept chains + finale + stretch pool, every step runnable) · step instructions as site attendee sub-pages · agent guidance page · troubleshooting sheet · the deployed mini-site they rebuilt.

Room/facilitators get: run-of-show script · per-block intro slides · agents-policy slide · instructor briefing · GitHub Pages fallback deploys of each capstone.

Public/promo: the live mini-site ("Made with R3F v10", billboards, all sections) · teaser + OG image · preview gifs per capstone · this updated Notion hub.

1. Docs & lesson content

# Deliverable Owner Due Status
1.1 03 · Lesson Plans rewrite Claude → Dennis Aug 16 ✅ pushed
1.2 Per-demo step instructions (format + L1 example done; each block's pages written when its chain is built) Claude draft → block lead reviews rolling 🟡
1.3 07 · Run of Show rewrite Claude → Dennis Aug 17 ✅ pushed
1.4 00 · Master Plan rework Claude → Dennis Aug 19 ✅ pushed
1.5 08 · Attendee Guide rewrite Claude → Dennis Aug 22 🚧 WIP pushed
1.6 13 · Intro Slides content Claude → Dennis Aug 24 🚧 placeholders pushed
1.7 11 · What You'll Build update Claude → Dennis Aug 20 🚧 WIP pushed
1.8 01 · Prerequisites content (becomes the prep email body) Claude → Dennis Aug 29 🚧 WIP pushed
1.9 Production tracker update (this page) Claude Aug 19
1.10 Troubleshooting refresh (WebGPU failure modes, from dry-run findings) Dennis Sep 1
1.11 Voice pass on all pushed pages Dennis rolling
1.12 Verify every v10 claim against released docs before shipping Claude at doc-freeze 🟡

2. Repos & code

# Deliverable Owner Due Status
2.1 Vite spine repo: v10/WebGPU deps, verify script (+WebGPU check), step tooling Dennis Aug 20
2.2 AM chains — hero stages (L1+L2) Dennis Aug 22
2.3 TSL/compute chain (flip-grid recut) Block lead (Dennis) Aug 25
2.4 State chain — TOD triptych (+ sky component into hero) Block lead (Kris?) Aug 26
2.5 Physics fast-show (footer + jolt/rapier variant) Block lead (Kris) Aug 27
2.6 Sky + postprocessing finale chain Block lead (Faraz?) Aug 28
2.7 Stretch pool: portal / magic-box / grain / footer variants + site stretch page Dennis Sep 1 ⬜ (designed cut)
2.8 Attendee-ready repo (what the prep email links) Dennis ~Sep 1
2.9 Full Day 1 dry-run on the new chains Dennis + instructors Aug 25–Sep 1

3. Comms

# Deliverable Owner When Status
3.0 React-skill poll — goes out early, for sure (3 questions drafted in the Comms page) Dennis ASAP 🟡 questions drafted
3.1 Comms schedule + outlines Claude → Dennis Aug 20 🟡 drafted (Comms page)
3.2 The prep email — everything in one send (repo first, tooling, WebGPU, React pre-work, site link, logistics) Dennis (via organizers) ~Sep 1 ⬜ gated on deps lock
3.3 Short logistics note (optional safety resend) Dennis Sep 4–5

4. Site (paris-mini-site)

# Deliverable Owner Due Status
4.1 v10 badge push / Codrops window David Aug 15 🟡
4.2 "What you'll build" + "Two days" sections (unblocked by the curriculum rework) Dennis Aug 20
4.3 Attendees/resources routes Dennis Aug 22 🟡 attendees built
4.4 3D billboard wordmark (replaces CSS letters) Dennis 🟡
4.5 Stretch-goals page (optional) Dennis Sep 1

5. Graphics / media + additional

# Deliverable Owner Due Status
5.1 Preview gifs per capstone (reused everywhere) Dennis, as chains finish Sep 1
5.2 Event teaser + OG image TBD (David?) Aug 20
5.3 Slide theme assets Dennis Aug 24
5.4 Track badges ×3 TBD Sep 1
5.5 Attendee sub-pages = step instructions (one artifact) Claude → block leads rolling
5.6 Agent guidance page (+ suggested prompts per step) Claude → Dennis Aug 24
5.7 Asset licensing check (Eiffel/city GLTFs, HDRIs) before repo goes public Dennis Aug 20
5.8 Version pinning + lockfile + repo public Dennis ~Sep 1 ⬜ gates the prep email
5.9 Patch contingency (ship pnpm patches in-repo if upstream misses) Dennis Aug 25
5.10 Dry-run calendar invites (Aug 25–Sep 1 window) Dennis Aug 18 ⬜ book now
5.11 Post-workshop feedback survey TBD Sep 5
5.12 GitHub Pages deploys of each capstone (day-of fallback) Dennis Aug 25

6. Day-of logistics

# Deliverable Owner Due Status
6.1 Instructor/floater briefing Dennis Sep 5
6.2 Confirm block leads — State (Kris?), Finale (Faraz?), + AM segments the team presents Dennis + team Aug 22 ⬜ leads need prep runway
6.3 Room kit: power, projector/big font, skill dots, signage Dennis + organizers Sep 7
6.4 Agents policy slide Dennis Sep 5

Critical path: lesson plans ✅ → chains (2.x) → deps lock + prep email (~Sep 1) → dry-run → media capture → voice pass. The riskiest line is 2.x: six chains in ~2 weeks — the stretch pool and variants are the designed relief valves; hero/TSL/state never get cut.