© Aldi Dwi Kurniawan — aldikurniawan.com
This case study uses Goal-Directed Design, a methodology developed by Alan Cooper that focuses on behavior goals rather than demographics. Instead of asking "who is the user?", GDD asks "what does the user need to accomplish?" — then designs every element to serve those goals.
| Phase | Focus | Output |
|---|---|---|
| 1. Research | Understand industrial buyer behavior and market context | Behavior patterns, site audit, competitor gaps |
| 2. Modeling | Define personas based on goals and behavior, not age/location | Goal-based persona with primary/secondary/negative goals |
| 3. Requirements | Map what the site MUST do to serve each goal | Requirements matrix per user goal |
| 4. Framework | Design decisions that fulfill each requirement | Design principles + section decisions |
| 5. Refinement | Visual execution and final UI | Key design decisions + UI output |
Why GDD for Helios: Industrial energy buyers visit a vendor website with a specific mission — evaluate technical credibility, assess project experience, request consultation. They are not browsing. GDD's behavior-goal framework maps directly to how these decision-makers actually think and act.
| Project | Helios Power System — Industrial Energy Website UI |
| Type | Self-initiated fictional project |
| Role | UI/UX Designer — Research → Visual Design |
| Platform | Web — Desktop (1440px) |
| Timeline | 2 days |
| Tools | Figma |
| Approach | Goal-Directed Design (GDD) |
| Status | ✅ Completed |
💡 Brief: Helios Power System is an engineering company delivering turbine-based power generation solutions for industrial operations. The challenge: design a corporate website that communicates technical credibility and engineering authority to Plant Managers and Engineering Directors — who evaluate vendors before ever picking up the phone.
"Industrial energy buyers don't browse. They investigate. The website has one job: survive their 10-minute scrutiny."
| Behavior | Pattern | Implication for Design |
|---|---|---|
| Pre-call research | 87% of B2B buyers complete extensive research before first vendor contact | Site must answer all credibility questions without human interaction |
| Technical validation first | Engineers look for specs, methodology, and case studies before anything else | Technical content must be front-loaded, not buried |
| Peer credibility | References from similar industries carry more weight than general claims | Project portfolio must show industry + geography + MW scale |
| Risk aversion | Industrial procurement has high cost of failure — conservative buyers | Every claim must be backed by a number or a proof |
| Team evaluation | Senior buyers evaluate the leadership team before committing | C-suite visibility with credentials is a trust accelerator |
| Mobile research | Initial research often on mobile, final evaluation on desktop | Mobile must be readable; desktop must be comprehensive |
| Problem Pattern | Industry Frequency | Impact on Buyer | Helios Solution |
|---|---|---|---|
| Generic hero with no technical positioning | 🔴 Very common | Buyer can't distinguish vendor in 5 seconds | Hero headline: exact service + outcome |
| Stats hidden in About page | 🔴 Very common | Credibility signals don't land before scroll | Stats row directly below hero, always visible |
| Project portfolio without scale data | 🔴 Common | Buyer can't assess if vendor has done their MW range | Each project card shows MW + country + type |
| No engineering methodology section | 🟡 Occasional | Buyer can't assess how Helios thinks, only what they've done | Dedicated methodology section with 4 pillars |
| Weak or generic CTA | 🔴 Common | Consultation request feels risky, not helpful | CTA: "Start Your Turbine Project with Engineering Certainty" |
| No leadership visibility | 🟡 Occasional | Buyer has no sense of who they'd be working with | Full leadership section: CEO, CTO, COO, CSO |
| Name | Raymond Hartono |
| Age | 47 years old |
| Location | Surabaya, Indonesia |
| Role | Plant Manager, Petrochemical Manufacturing |
| Plant Scale | 850 MW installed capacity, continuous 24/7 operations |
| Decision Authority | Approves vendor shortlist, influences final procurement |
| Device | Desktop — Chrome (evaluation) + Mobile — initial research |
| Industry Experience | 20+ years in industrial energy and plant operations |