π GEM Resource Hub Β· π Library Β· π About RocketLevel Β· π Playbooks Β· πΊοΈ What's Your Market Worth? Β· π Book a Call
A plain-language guide for restoration owners, project managers and the office staff who carry a homeowner through a claim, backed by decades of experience in the trade. This is general education, not insurance or legal advice; the homeowner's policy and the adjuster govern the actual claim.
Every residential claim runs through the same stages: the loss is reported, an adjuster assesses the damage and what the policy covers, a scope is agreed, the carrier pays (usually in stages, with the homeowner's deductible already netted out of the check), the work gets done, the homeowner pays that deductible amount to you as part of paying for the work, and the final money is released. Know that map well and you can guide a rattled homeowner through it instead of being one more thing they don't understand.
You manage the repair: the labor, materials, equipment, and craftsmanship. You are not the adjuster, and you do not adjust the claim. What you do is document and scope the real damage so the claim reflects what actually happened. When you can, have the homeowner, the adjuster, and you walk the loss together; aligning everyone early heads off a lot of disputes later.
The signature you take in a wet living room at 11 p.m. is a consumer contract, and federal and state rules attach to it whether or not anyone in the room is thinking about that.
The three-day right to cancel. The Federal Trade Commission's (FTC) Cooling-Off Rule at 16 CFR Part 429 reaches a sale you solicit and sign somewhere other than your own place of business. Read the dollar trigger carefully, because it is two numbers, not one: $25 or more when the buyer signs at their residence, and $130 or more when they sign anywhere else, under 16 CFR 429.0(a). A kitchen-table signing on a loss is the $25 track, which describes nearly every restoration signing. The buyer gets three business days to cancel, and you have to hand them a completed notice of cancellation in duplicate, in the language the sale was conducted in, at the moment they sign. Get that wrong and the cancellation clock never starts, which can leave the contract cancellable long after your crew has finished.
The emergency path exists and it is narrower than many contractors believe. A flooded house is not enough on its own. The buyer has to have initiated the contact, asking you to come out for work needed to meet a genuine emergency, and they have to give you a separate, dated, signed statement in their own handwriting describing the emergency and expressly waiving the right to cancel. A pre-printed checkbox on your form is not a handwritten waiver. Put the real version in the emergency packet so a tech is not improvising language at midnight. Then check your state on top of the federal rule. Your state may run a longer cancellation window or require its own wording on home repair and disaster-repair contracts, so look up yours.
Down payment limits. Your state may cap what you can take up front on residential work, so look up yours. California limits a home improvement down payment to $1,000 or 10 percent of the contract amount, whichever is less, under Business and Professions Code 7159.5(a)(3). Find your state's number before the office asks for a deposit.
Assignment of benefits. If your authorization form contains an assignment of benefits, or anything that operates like one, check whether your state still permits it. Florida says a policyholder may not assign post-loss benefits under a residential or commercial property policy issued on or after January 1, 2023, and that an attempt to do so is void, invalid and unenforceable, Fla. Stat. 627.7152(13), with narrow exceptions at subsection (11). Other states have layered on restrictions and required disclosures. An unenforceable assignment can also drag down the rest of the document it is stapled into.
<aside> β οΈ
A missing notice of cancellation can leave a finished job cancellable. The three-day rule, its two dollar triggers and its handwritten emergency waiver are set by 16 CFR 429.0 and 429.1, and your state's home-solicitation rules sit on top. This is not legal advice. Spend an hour with a construction lawyer in your state before you sign. It costs a lot less than the fight afterward.
</aside>
The first job is to stop the loss from getting worse (extraction, board-up, drying) before anything migrates further. Do not make permanent repairs before the adjuster has seen the damage, except for genuine emergency mitigation. And document before you touch anything: photos and video of every affected area are the backbone of the whole claim, and they often decide whether the approval goes smoothly or turns into a fight.
On a water loss, the most valuable thing your tech does all night often happens in the first ten minutes: finding the shutoff and closing it. Every gallon that never reaches the subfloor is drying time, tear-out and contents you never have to scope. It is also the easiest part of the job to lose from the file, because by the time anyone writes a note the water has been off for hours and nobody remembers who turned the valve.