π GEM Resource Hub Β· π Library Β· π About RocketLevel Β· π Playbooks Β· πΊοΈ What's Your Market Worth? Β· π Book a Call
A RocketLevel playbook for restoration owners scoping and documenting residential water, fire, and mold losses, backed by decades of experience in the trade. About an 8-minute read.
You walked the loss, you wrote the estimate, and the adjuster came back with cuts, questions, or a denial on half the line items. In plenty of disputed files, the real problem is that the file doesn't prove the damage. The adjuster was not standing in the house when the water hit. Your documentation is the only evidence they have, and wherever it leaves a gap, they fill that gap with a no.
Run the same five passes on every job, water, fire, or mold, so nothing gets missed under pressure.
S, Stabilize and classify. Record the cause of loss, the date, and the category and class of water, or the smoke and soot type for a fire. Stop the damage from spreading before it migrates into clean areas, but do not make permanent repairs before the adjuster has seen the loss, except for genuine emergency mitigation.
C, Capture every room. Photograph wide to tight: the whole room, then the damaged wall or assembly, then the close-up of the material. Narrate a video as you walk. Photograph the unaffected rooms too, so the boundary of the loss is obvious.
O, Obtain readings. Moisture readings on affected and unaffected materials, temperature and relative humidity, and a moisture map. On a drying job, log readings daily so the file proves the structure actually dried and justifies every day of equipment.
P, Put it in writing. A sketch or diagram with measurements, room dimensions, affected square footage, and notes on what you found behind the drywall or under the flooring. The detail you write down today is the line item you defend in three weeks.
E, Estimate in the carrier's language. Translate the scope into clean line items the adjuster can read and match against their own estimate.
A file that cites a superseded standard invites exactly the scrutiny you were documenting to avoid. Water work runs to ANSI/IICRC S500, the Institute of Inspection, Cleaning and Restoration Certification (IICRC) water damage standard, 5th Edition, 2021, an American National Standards Institute (ANSI) standard. Mold runs to S520, 4th Edition, 2024. Fire and smoke has had its own standard since 2025, S700, 1st Edition, 2025, and its scope is worth reading closely because it does not cover wildfire losses. If you work wildfire, do not cite S760 as governing. That document is a Board of Standards Review (BSR) draft and has not been published, and an unpublished standard in a claim file is a hole somebody will eventually find.
<aside> βοΈ
Reviewed October 2026. Federal and state rules change, and licensing rules vary by state. Use this page to know what to ask, then confirm with your state agency or a construction attorney before you rely on it.
</aside>
One stop rule sits ahead of everything else on this page, however urgent the loss.
Asbestos. Start with what does not apply. EPA's asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) rule requires a thorough inspection before demolition or renovation of a "facility" at 40 CFR 61.145(a), with no quantity floor on that inspection (the 160 square foot and 260 linear foot figures in that section govern notification and removal, not whether you inspect). But the facility definition at 61.141 excludes residential buildings with four or fewer dwelling units, so a single-family house demolished or renovated on its own is outside the federal rule. Your state or local air district may require a survey before residential demolition anyway, so look up yours. What always applies to your crew is OSHA. OSHA presumes thermal system insulation and surfacing material to be asbestos-containing in buildings constructed no later than 1980, 29 CFR 1926.1101(b), and requires asphalt and vinyl flooring installed no later than 1980 to be treated as asbestos-containing under 1926.1101(k)(1), until an inspection says otherwise. Note the direction of that date. A house finished in 1980 sits inside the presumption, not outside it.