π GEM Resource Hub Β· π Library Β· π About RocketLevel Β· π Playbooks Β· πΊοΈ What's Your Market Worth? Β· π Book a Call
A RocketLevel playbook for restoration owners running program and TPA assignment work, backed by decades of experience in the trade. About an 8-minute read.
Program and third-party administrator (TPA) work (the assignments that come through a network with set rules) is a real and useful channel. It fills the calendar, smooths the slow months, and forces a level of documentation discipline that makes the whole company better. The catch is one plenty of operators eventually feel: the volume is not yours. It can be turned down, re-routed, or re-priced by someone you do not control. The job is to run the program well and, at the same time, make sure it is not the only thing holding the business up.
Working a program well means doing two things in parallel: deliver the program to its standard so you keep and grow the volume, and build revenue alongside it that does not depend on the program. The two work together, because the cash flow and the operational discipline the program gives you are what fund the second job.
Programs run on metrics, and the operators who win more volume are the ones who treat the scorecard as the product.
Response time. Programs almost always set contact and on-site time expectations, and they are tracked. Hitting them consistently is one of the first things a network looks at when it decides who gets the next assignment. Build your intake and dispatch so the clock is never the thing that fails you.
Documentation and photo standards. Programs specify exactly what they want documented and how. Meet the standard every time, because incomplete files slow your payment and hurt your score.
Scorecard metrics. Cycle time, customer satisfaction, estimate accuracy, and rework all feed your standing in the network. Know which metrics you are graded on and manage to them deliberately.
Program pricing is set by someone else, so margin comes from execution. Know your true cost per job, watch the work types that lose money at program rates, and do not let program volume crowd out higher-margin work you control. A program job that loses money still shows up as volume on the scorecard, which is why it is easy to miss.
Program and TPA work is a legitimate way to keep volume on the board. It also runs on administrative and pricing rules that bleed margin if you do not manage them tightly. You can do a flawless technical job drying a building and still lose money on it, because the scorecard grades digital speed and compliance, not the quality of the dry-down. The specific windows and rates below illustrate how these programs are typically built. Pull your own program's actual service-level agreement (SLA) numbers out of its agreement and its portal and manage to those, because they differ by network, by region, and by carrier, and running against a number you half remember is how you miss one.
1. Time to Estimate (TTE). On the program agreements we have read, the window being watched runs 24 to 48 hours from the end of inspection to estimate upload, usually stacked on top of a 2 to 4 hour contact-to-inspection target that rushes your field tech before the job even starts. A compliant estimate needs a precise moisture map, a captioned photo journal for every room, and line items matched to that carrier's validation rules. When your estimator burns two hours at a laptop for every hour in the field, your real labor cost balloons. Miss the window and the scoring algorithm drops your rank, and the assignment flow dries up overnight.